SINGAPORE (Dec 10): ST Telemedia Global Data Centres (STT GDC) is beginning construction at the more than $350 million STT Loyang, their largest data centre facility in Singapore to date, and the group’s seventh facility locally.

STT Loyang will boast an IT load capacity of 35MW and its construction will begin in early 2019 on the five-story facility at Loyang Way, with Gross Floor Area (GFA) of over 290,000 sf and Net Lettable Area (NLA) of 107,000 sf. STT Loyang is expected to be completed by mid-2020.

The new Tier III DC facility will provide high levels of redundancy in terms of power, storage, compute and network capacity to ensure smooth operations in the event of any unforeseen circumstances. It will also be Threat Vulnerability Risk Assessment (TVRA)-certified to the highest level to offer the most secure operational environment.

To continue reading,

Sign in to access this Premium article.

Subscription entitlements:

Less than $9 per month
3 Simultaneous logins across all devices
Unlimited access to latest and premium articles
Bonus unlimited access to online articles and virtual newspaper on The Edge Malaysia (single login)

Stay updated with Singapore corporate news stories for FREE

Follow our Telegram | Facebook