Home News Aviation & Engineering

Changi's Terminal 2 to be re-opened in stages in tandem with air travel recovery

The Edge Singapore
The Edge Singapore5/22/2022 10:46 PM GMT+08  • 2 min read
Changi's Terminal 2 to be re-opened in stages in tandem with air travel recovery
Passenger traffic has reached more than 40% of pre-Covid levels / Photo: Samuel Isaac Chua
Font Resizer
Share to WhatsappShare to FacebookShare to LinkedInMore Share
Scroll to top
Follow us on Facebook and join our Telegram channel for the latest updates.

Changi Airport’s Terminal 2 will re-open progressively starting from May 29, ahead of the pick-up in passenger volume, says the Changi Airport Group.

Terminal 2 has been shut since May 2020, when air traffic collapsed because of the pandemic. It was put through a major refurbishment, which will increase its annual handling capacity by 5 million to 28 million when fully completed come 2024.

Terminals 1 and 3 remain in business, while Terminal 4, the budget terminal, is similarly shut like Terminal 2.

For more insights on corporate trends...
Sign In or Create an account to access our premium content.
Subscription Entitlements:
Less than $9 per month
Unlimited access to latest and premium articles
3 Simultaneous logins across all devices
Bonus unlimited access to online articles and virtual newspaper on The Edge Malaysia (single login)
×
Loading next article...
The Edge Singapore
Download The Edge Singapore App
Google playApple store play
Keep updated
Follow our social media
Subscribe to The Edge Singapore
Get credible investing ideas from our in-depth stock analysis, interviews with key executives, corporate movements coverage and their impact on the market.
© 2022 The Edge Publishing Pte Ltd. All rights reserved.
Unlock unlimited access to premium articles with less than $9 per month. Subscribe Now